This method can easily satisfy constraints of the maximum allowable number of tap changer operations, moreover, optimization calculation only includes the voltages of generators and compensation capacity for the most time segments, so it improves calculation speed. 这种方法能比较容易地满足1d内变压器分接头动作次数的限制,而且对于大部分时间段只进行发电机端电压和补偿容量的优化计算,减少了计算时间。
A Second Discussion on Determination of Maximum Allowable Reciprocating Pump Speed 关于往复泵最高允许冲次的思考&兼与《探讨确定钻井泵最高允许冲次的方法》的作者商榷
The relative displacement under static wind load between the catwalk and main cable is computed to definite the maximum allowable wind speed for the main cable construction. 计算静风荷载下猫道与索股间相对变位,确定便于主缆施工的最大风速。